This article will demonstrate the correct packaging of the Power Switcher for delivery to the Reef Factory service center.

⚠️ Failure to adequately secure the unit for transport may void the unit’s warranty and result in service refusal!


  1. Put the Power Switcher in its original packaging or wrap it with a soft material.

2. Prepare a cardboard box and fill it with a medium to dampen shocks.


3. Place the device in the box, secure it with a shock-absorbing medium, and carefully seal the parcel with tape.


⚠️ Do not pack the device in a way that allows it to move inside the parcel packaging during transportation!